DCD Connect

16th & 17th September 2025 - London

As microprocessor thermal design powers push toward 2 kW, data centres face growing challenges in cooling and power delivery. Traditional infrastructure often can’t handle these loads without major redesigns and high costs.

Join RiSE (Research Institute of Sweden) to see how their Chip Load Emulator (CLE) replicates the exact power draw and heat profile of next-generation high-density servers. By emulating real-world loads before hardware arrives, the CLE lets you validate thermal loops, refine facility interfaces, and optimise power provisioning.

Unlike simple heaters or generic load banks, it provides realistic, repeatable, and configurable tests — helping identify issues early, prevent overbuilding, and speed deployments so your data center is ready for the next generation of ultra-dense computing.

Source: https://www.datacenterdynamics.com/en/dcdconnect-live/london/2025/dcdshowcase-with-rise/